WASTE WATER TREATMENT PLANTS Tulcea

NEW WASTE WATER TREATMENT PLANT IN TULCEA

Tulcea wastewater treatment plant ensures a mechanical wastewater treatment, followed by a biological treatment through 4 activated sludge basins with integrated selector compartment for phosphorus biological removal and biological selection of flocculants micro-organisms.

The following stage is the mechanical thickening of sludge and excess sludge. Pre- thickened sludge undergoes to an anaerobic digestion process where organic substances are degraded into methane and carbon dioxide. Digested sludge is then dewatered by a centrifuge.

Activitatile desfasurate in cadrul contractului:

  • proiectare
  • executie
  • punere in functiune
  • operare pe perioada testelor
epurare-tulcea-mare

Deversare efluent: Fluviul Dunarea
Perioada de executie: 39 luni
Localizare: Municipiul Tulcea
Sursa de finantare: fonduri EU

epurare-tulcea-1
epurare-tulcea-2
epurare-tulcea-3
epurare-tulcea-4