Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/coralco/public_html/wp-content/plugins/revslider/includes/operations.class.php on line 2254

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/coralco/public_html/wp-content/plugins/revslider/includes/operations.class.php on line 2258

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/coralco/public_html/wp-content/plugins/revslider/includes/output.class.php on line 2941
WASTE WATER TREATMENT PLANTS Isaccea and Macin | CORAL

WASTE WATER TREATMENT PLANTS Isaccea and Macin

WASTE WATER TREATMENT PLANTS IN MACIN AND ISACCEA

Isaccea and Macin wastewater treatment plants ensures a mechanical wastewater treatment, followed by a biological treatment with activated sludge, followed by the sludge processing step through thickening and dewatering the primary chemical sludge in excess.

Activitatile desfasurate in cadrul contractului:

  • proiectare
  • executie
  • punere in functiune
  • operare pe perioada testelor

Deversare efluent: Fluviul Dunarea
Perioada de executie: 35 luni
Localizare: Isaccea si Macin, jud. Tulcea
Sursa de finantare: fonduri EU

epurare-macin-isaccea-mare
referinte-epurare-macin-isaccea
epurare-macin-isaccea-1
epurare-macin-isaccea-2
epurare-macin-isaccea-3