INTEGRATED WASTE MANAGEMENT SYSTEM
The goal was the constructions of an ecological waste landfill in Mahai Bravu unincorporated area, with a storage capacity for a period of about 20 years of domestic waste in zone 2 – Mihai Bravu, Zone 3 – Macin and Zone 4 – Delta.
The contract for construction of Mihai Bravu waste landfill includes achieving a waste landfill in the area Mihai Bravu including supply, installation, commissioning and running the machines and related technological equipment.